Telegram-Icon YouTube-Icon whatsapp-Icon

Omnitech Engineering IPO is a mainboard IPO aggregating up to ₹582 crore 99 lakh 99 thousand 6 hundred eighty six. The issue consists of a fresh issue of 1,84,14,096 shares (aggregating up to 417 crore 99 lakh 99 thousand 7 hundred ninety two) and an offer for sale of 72,68,722 shares (aggregating up to 164 crore 99 lakh 99 thousand 8 hundred ninety four).

The IPO opened for subscription on 25 February 2026 and closes on 27 February 2026. The basis of allotment was finalised on 2 March 2026. The shares were listed on NSE and BSE on 5 March 2026.

The price band for the IPO is set at ₹216 to ₹227 per share. The minimum amount required for a retail investor is ₹14,982 (66 shares, 1 lot). The minimum amount required for an sHNI investor is ₹2,09,748 (924 shares, 14 lots).

The final allotment price for the Omnitech Engineering IPO was fixed at ₹227 per share. The shares successfully listed on the BSE at ₹205.00 per share (with a listing gain of -9.69 %) and on the NSE at ₹202.00 per share (with a listing gain of -11.01 %).

Equirus Capital Pvt Ltd and ICICI Securities Ltd is the lead manager and MUFG Intime India Private Limited is the registrar of the IPO.
Refer to Omnitech Engineering RHP for more detailed information.

Omnitech Engineering Share Price Analysis Local DB (Max)

535.60
-4.90 (-0.91%)
As of 01 Sep, 2026
Open ₹541.00
Day High - Low ₹551.00 - ₹520.00
Volume 392,314
52 Weeks High ₹764.85 on 06 Aug 2026
52 Weeks Low ₹176.25 on 09 Mar 2026
RSI (14) 41.7
50 DMA 565.29
200 DMA -
Loading...

Omnitech Engineering IPO Details Listed

IPO Datei
The opening and closing dates during which investors can apply for the IPO.
25 February 2026 to 27 February 2026
Listing Datei
The date when shares start trading on the stock exchanges.
5 March 2026
Face Valuei
The nominal value of a security stated in the company books. Mainly used as the base for dividends and accounting
₹5 per share
Price Bandi
The minimum and maximum price range within which investors can bid for IPO shares.
₹216 to ₹227 per share
Employee Discounti
A reduced price offered exclusively to eligible company employees applying in the IPO.
₹11.00 per share
Lot Sizei
The minimum number of shares an investor must apply for in a single IPO application.
66 shares
Allotment Pricei
The final price at which shares are allocated to investors after the bidding process closes.
₹227 per share
Listing Price (NSE)i
The opening trade price of the stock on its first day on the exchange (National Stock Exchange)
202.00
Listing Gain (NSE)i
The percentage change between the allotment price and the listing price on listing day at NSE
-11.01 %
Listing Price (BSE)i
The opening trade price of the stock on its first day on the exchange (Bombay Stock Exchange).
205.00
Listing Gain (BSE)i
The percentage change between the allotment price and the listing price on listing day at BSE
-9.69 %
Issue Typei
The method used to price the IPO. In a Book Built Issue, the price is determined by investor demand within the price band.
Book Built Issue
Listing Ati
The stock exchange(s) where the company shares will be officially listed and traded.
NSE, BSE

IPO Issue Details

Issue Sizei
Total number of shares multiplied by the issue price.
2,56,82,818 shares (up to ₹5,82,99,99,686)
Issue (Sale Type)i
Indicates whether the IPO includes new shares (Fresh Issue), existing shares sold by promoters (OFS).
Fresh Issue and Offer For Sale
Fresh Issuei
New shares created and sold by the company. Proceeds go directly to the company for business use.
1,84,14,096 shares (up to ₹4,17,99,99,792)
Offer for Salei
Existing shares sold by promoters or investors. Proceeds go to the sellers, not the company.
72,68,722 shares (up to ₹1,64,99,99,894)
Share Holding (Pre Issue)i
Total number of shares outstanding before the IPO.
10,52,49,680 shares
Share Holding (Post Issue)i
Total number of shares outstanding after the fresh issue shares are added.
12,36,63,776 shares
ISIN Numberi
A unique 12 character international code that identifies a specific security for trading and settlement.
INE0UH301010
BSE Scrip Codei
A unique numeric code assigned by the Bombay Stock Exchange to identify a listed company.
544720
NSE Symboli
A unique ticker symbol assigned by the National Stock Exchange to identify a listed company.
OMNI
The Omnitech Engineering IPO is a mainboard IPO with issue size 2,56,82,818 shares (aggregating up to ₹582 crore 99 lakh 99 thousand 6 hundred eighty six). The issue is priced at ₹216 to ₹227 per share and is a mix of a fresh issue of 1,84,14,096 shares (aggregating up to 417 crore 99 lakh 99 thousand 7 hundred ninety two) and an offer for sale of 72,68,722 shares (aggregating up to 164 crore 99 lakh 99 thousand 8 hundred ninety four).

IPO Timetable (Tentative)

Omnitech Engineering IPO opened for subscription on 25 February 2026 and closed on 27 February 2026. The allotment for the Omnitech Engineering IPO was finalized on 2 March 2026. Omnitech Engineering IPO was listed on BSE, NSE on 5 March 2026.
IPO Open Datei
The start date for applying to the IPO. It is the first day on which investors can submit their IPO applications.
25 February 2026
IPO Close Datei
The last date to submit an IPO application. It is the last day by which investors must submit their applications.
27 February 2026
Basis of Allotment Datei
The date on which the final share allotment is determined and published.
2 March 2026
Initiation of Refundsi
The date from which unallotted application amounts are returned to investors.
3 March 2026
Credit of Share to Demati
The date by which allotted shares are transferred into investors demat accounts.
4 March 2026
Listing Datei
The date when shares start trading on the stock exchanges.
5 March 2026
IPO Cut-off time (UPI mandate confirm)i
The deadline for confirming UPI payment mandates for IPO applications.
5:00 PM on 27 February 2026

Omnitech Engineering IPO Lot Size & Required Amount

Omnitech Engineering IPO has set a price band of per share and lot size is of shares. Retail investors can bid for a minimum of 1 lot (66 shares), requiring minimum investment of ₹14,982, and maximum upto 13 lots (858 shares), requiring maximum investment of ₹1,94,766. Small HNI investors can bid for a minimum of 14 lots (924 shares), requiring an investment of ₹2,09,748, small hni (sHNI) investors can bid for a maximum of 66 lots (4356 shares), requiring an investment of ₹9,88,812 and big hni (bHNI) investors can bid for a minimum of 67 Lots (4422 shares), requiring an investment of ₹10,03,794. Calculated at the cut-off price ₹ per share (the upper end of the price band).

Number of Shares Per Lot = Shares

Application Lot(s) Shares Amount
Retail (Min)i
Minimum investment required for Retail Individual Investors (RII).
1 66 ₹14,982
Retail (Max)i
Maximum investment allowed for Retail Individual Investors (Must be under ₹2 Lakhs).
13 858 ₹1,94,766
S-HNI (Min)i
Minimum investment for Small High Net-worth Individuals (sHNI) (Must be above ₹2 Lakhs).
14 924 ₹2,09,748
S-HNI (Max)i
Maximum investment for Small High Net-worth Individuals (sHNI) (Must be up to ₹10 Lakhs).
66 4356 ₹9,88,812
B-HNI (Min)i
Minimum investment for Big High Net-worth Individuals (bHNI) (Must be above ₹10 Lakhs).
67 4422 ₹10,03,794

IPO Application Calculator

Important Information

  • This calculator finds the max lots under your budget that also fits your chosen category.
  • Retail (RII): Application value must be ≤ ₹2,00,000.
  • Small HNI (sHNI): Application value must be > ₹2,00,000 and ≤ ₹10,00,000.
  • Big HNI (bHNI): Application value must be > ₹10,00,000.

IPO Reservation

Omnitech Engineering IPO offers total 2,56,82,819 shares (100.00%) . Out of which 1,28,18,262 shares (49.91%) allocated to QIB, 51,26,633 (19.96%) allocated to QIB (Ex- Anchor), 38,45,478 shares (14.97%) allocated to NII, 89,72,783 shares (34.94%) allocated to RII and 76,91,629 (29.95%) allocated to Anchor investors.

Investor CategoryShares Offered
+
QIB Shares Offeredi
Qualified Institutional Buyers (e.g., mutual funds, banks).
1,28,18,262 shares (49.91%)
-
QIB (Anchor Investor)i
A portion of QIB shares reserved specifically for anchor investors.
76,91,629 (29.95%)
-
QIB (Ex. Anchor)i
Remaining QIB shares after anchor investor allocation.
51,26,633 (19.96%)
+
NII (HNI) Shares Offeredi
Non-Institutional Investors, also known as High Net-worth Individuals.
38,45,478 shares (14.97%)
-
bNII (bids > ₹10L)i
Big HNI category for applications above ₹10 Lakhs.
25,63,652 shares (9.98%)
-
sNII (bids < ₹10L)i
Small HNI category for applications between ₹2 Lakh and ₹10 Lakh.
12,81,826 (4.99%)
Employee Shares Offeredi
Shares reserved specifically for eligible employees of the company.
46,296 shares (0.18%)
Retail Shares Offeredi
Retail Individual Investors applying for up to ₹2 Lakh.
89,72,783 shares (34.94%)
Total Shares Offered 2,56,82,819 shares (100.00%)

IPO Anchor Investors

Omnitech Engineering IPO raises ₹174.60 crore from anchor investors. Omnitech Engineering IPO anchor bid date was 24 February 2026.

💼 Anchor Investors Allocation Letter (PDF)
Bid Datei
The date on which anchor investors can bid for the shares.
24 February 2026
Shares Offeredi
Total number of shares allocated specifically to anchor investors.
76,91,629 shares
Anchor Portion (₹ Cr.)i
Total value of the shares allocated to anchor investors in crores.
174.60
Omnitech Engineering
Annual Performance (31 Mar 25 vs 31 Mar 24)
Omnitech Engineering's Assets increased by 61.8%, Revenue increased by 92.2%, Profit After Tax increased by 132%, EBITDA increased by 81.2%, Net Worth increased by 159.4%, Total Borrowing increased by 43.4%, Reserves & Surplus increased by 426.9% compared to the previous financial year.
Assets
▲ 61.8% (239.34)
Revenue
▲ 92.2% (167.76)
Profit After Tax
▲ 132% (24.96)
EBITDA
▲ 81.2% (52.71)
Net Worth
▲ 159.4% (125.63)
Total Borrowing
▲ 43.4% (100.14)
Reserves & Surplus
▲ 426.9% (123)

Previous Financial Year Growth (31 Mar 24 vs 31 Mar 23)
Comparing 31 Mar 24 with 31 Mar 23, Assets increased by 109%, Revenue dropped by 1%, Profit After Tax dropped by 41.4%, EBITDA increased by 2.3%, Net Worth increased by 31.6%, Total Borrowing increased by 159.5%, Reserves & Surplus dropped by 47.5%.
Assets (Prev Yr)
▲ 109% (201.81)
Revenue (Prev Yr)
▼ 1% (-1.76)
Profit After Tax (Prev Yr)
▼ 41.4% (-13.38)
EBITDA (Prev Yr)
▲ 2.3% (1.48)
Net Worth (Prev Yr)
▲ 31.6% (18.91)
Total Borrowing (Prev Yr)
▲ 159.5% (141.68)
Reserves & Surplus (Prev Yr)
▼ 47.5% (-26.09)

2-Year Performance Change (31 Mar 23 To 31 Mar 25)
Between 31 Mar 25 and 31 Mar 23, Assets increased by 238.2%, Revenue increased by 90.4%, Profit After Tax increased by 35.9%, EBITDA increased by 85.4%, Net Worth increased by 241.3%, Total Borrowing increased by 272.3%, Reserves & Surplus increased by 176.5%.
Assets (2-Yr Change)
▲ 238.2% (441.15)
Revenue (2-Yr Change)
▲ 90.4% (166)
Profit After Tax (2-Yr Change)
▲ 35.9% (11.58)
EBITDA (2-Yr Change)
▲ 85.4% (54.19)
Net Worth (2-Yr Change)
▲ 241.3% (144.54)
Total Borrowing (2-Yr Change)
▲ 272.3% (241.82)
Reserves & Surplus (2-Yr Change)
▲ 176.5% (96.91)
  30 Sep 25 In Cr. 31 Mar 25 In Cr. 31 Mar 24 In Cr. 31 Mar 23 In Cr.
Assets 766.65 626.33 386.99 185.18
Revenue 236.69 349.71 181.95 183.71
Profit After Tax 27.78 43.87 18.91 32.29
EBITDA 70.08 117.65 64.94 63.46
Net Worth 232.27 204.44 78.81 59.9
Total Borrowing 382.91 330.63 230.49 88.81
Reserves & Surplus 179.65 151.81 28.81 54.9

Financial Performance Indicator (FPI)

FPI 30 Sep 2025 31 Mar 2025
ROEi
Return on Equity (ROE) is a measure of financial performance...
12.07%21.55%
ROCEi
Return on Capital Employed indicates how efficiently a company uses its capital.
9.19%16.08%
Debt/Equityi
A ratio comparing total liabilities to shareholder equity.
1.651.60
RoNWi
RoNW (Return on Net Worth) is the percentage of profit earned relative to the company's net worth and reflects overall profitability for shareholders.
11.96%21.46%
PAT Margini
Profit After Tax as a percentage of revenue. Shows how much net profit is retained from every rupee of sales.
11.74%12.54%
EBITDA Margini
EBITDA Margin indicates earnings before interest, tax, depreciation, and amortisation as a percentage of revenue; reflects core operating efficiency.
30.72%34.31%
Price to Book Valuei
Compares the stock's market price to its book value per share. A higher ratio may indicate market premium.
11.45
Pre IPOPost IPO
EPS Rsi
Earnings Per Share is a company's profit divided by outstanding shares.
₹4.17₹4.49
P/E (x)i
Price to Earnings ratio is the ratio of a stock's market price to its earnings per share. Indicates how much investors pay per rupee of earnings.
54.4750.53
Promoter Holdingi
The percentage of total shares held by the company's founders or promoter group.
94.08%74.19%
Market Capi
Total market value of a company's outstanding shares.
₹2,807.17 crore

IPO Peer Comparison

Company NameP/E ratioEPS (Basic)EPS (Diluted)NAV (per share)RoNW (%)P/BV
Dynamatic Technologies139.28(Dynamatic)63.39(Dynamatic)63.39(Dynamatic)1,056.48(Dynamatic)6.00(Dynamatic)(Dynamatic)
MTAR Technologies196.78(MTAR)17.19(MTAR)17.19(MTAR)236.97(MTAR)7.26(MTAR)(MTAR)
PTC Industries428.48(PTC)41.37(PTC)41.33(PTC)925.42(PTC)4.40(PTC)(PTC)
Unimech Aerospace and Manufacturing56.68(Unimech)17.59(Unimech)17.59(Unimech)131.53(Unimech)12.48(Unimech)(Unimech)
Azad Engineering103.30(Azad)14.66(Azad)14.66(Azad)215.70(Azad)6.21(Azad)(Azad)
Omnitech Engineering(Omnitech)4.26(Omnitech)4.26(Omnitech)19.82(Omnitech)21.46(Omnitech)(Omnitech)

Omnitech Engineering IPO Registrar

MUFG Intime India Private Limited
+91 2827287637
compliance@omnitecheng.com

Omnitech Engineering Address & Contact Details

Omnitech Engineering Address
Plot No. 2500, Kranti Gate Main Road, GIDC Lodhika Ind Estate, Kalawadd Rd, Metoda Rajkot, Gujarat, 360021
+91 2827287637
compliance@omnitecheng.com