Telegram-Icon YouTube-Icon whatsapp-Icon

Search Issue:

Central Mine Planning IPO is a mainboard IPO aggregating up to 1,842 crore 12 lakh rupees. The issue consists entirely of an offer for sale of 10,71,00,000 shares (aggregating up to 1,842 crore 12 lakh rupees).

The IPO opened for subscription on 20 March 2026 and closes on 24 March 2026. The basis of allotment was finalised on 25 March 2026. The shares were listed on NSE and BSE on 30 March 2026.

The price band for the IPO is set at ₹163 to ₹172 per share. The minimum amount required for a retail investor is ₹13,760 (80 shares, 1 lot). The minimum amount required for an sHNI investor is ₹2,06,400 (1,200 shares, 15 lots).

The final allotment price for the Central Mine Planning IPO was fixed at ₹172 per share. The shares successfully listed on the BSE at ₹162.80 per share (with a listing gain of -5.34%) and on the NSE at ₹160.00 per share (with a listing gain of -6.98%).

IDBI Capital Markets Services Ltd and SBI Capital Markets Ltd is the lead manager and KFin Technologies is the registrar of the IPO.
Refer to Central Mine Planning RHP for more detailed information.

Central Mine Planning & Design Institute Share Price Analysis API (Live)

222.68
-8.24 (-3.57%)
As of 01 Sep, 2026
Open ₹230.92
Day High - Low ₹231.83 - ₹221.10
Volume 2,052,412
52 Weeks High ₹283.69 on 03 Jul 2026
52 Weeks Low ₹150.16 on 07 Apr 2026
RSI (14) 33.4
50 DMA 249.00
200 DMA -
Loading...

Central Mine Planning IPO Details Listed

IPO Datei
The opening and closing dates during which investors can apply for the IPO.
20 March 2026 to 24 March 2026
Listing Datei
The date when shares start trading on the stock exchanges.
30 March 2026
Face Valuei
The nominal value of a security stated in the company books. Mainly used as the base for dividends and accounting
₹2 per share
Price Bandi
The minimum and maximum price range within which investors can bid for IPO shares.
₹163 to ₹172 per share
Lot Sizei
The minimum number of shares an investor must apply for in a single IPO application.
80 shares
Allotment Pricei
The final price at which shares are allocated to investors after the bidding process closes.
₹172 per share
Listing Price (NSE)i
The opening trade price of the stock on its first day on the exchange (National Stock Exchange)
160.00
Listing Gain (NSE)i
The percentage change between the allotment price and the listing price on listing day at NSE
-6.98%
Listing Price (BSE)i
The opening trade price of the stock on its first day on the exchange (Bombay Stock Exchange).
162.80
Listing Gain (BSE)i
The percentage change between the allotment price and the listing price on listing day at BSE
-5.34%
Issue Typei
The method used to price the IPO. In a Book Built Issue, the price is determined by investor demand within the price band.
Book Built Issue
Listing Ati
The stock exchange(s) where the company shares will be officially listed and traded.
NSE, BSE

IPO Issue Details

Issue Sizei
Total number of shares multiplied by the issue price.
10,71,00,000 shares (18,42,12,00,000)
Issue (Sale Type)i
Indicates whether the IPO includes new shares (Fresh Issue), existing shares sold by promoters (OFS).
Offer for sale only
Offer for Salei
Existing shares sold by promoters or investors. Proceeds go to the sellers, not the company.
10,71,00,000 shares (18,42,12,00,000)
Share Holding (Pre Issue)i
Total number of shares outstanding before the IPO.
71,40,00,000 shares
Share Holding (Post Issue)i
Total number of shares outstanding after the fresh issue shares are added.
71,40,00,000 shares
ISIN Numberi
A unique 12 character international code that identifies a specific security for trading and settlement.
INE05HV01027
BSE Scrip Codei
A unique numeric code assigned by the Bombay Stock Exchange to identify a listed company.
544739
NSE Symboli
A unique ticker symbol assigned by the National Stock Exchange to identify a listed company.
CMPDI
The Central Mine Planning IPO is a mainboard IPO with issue size 10,71,00,000 shares (aggregating up to 1,842 crore 12 lakh rupees). The issue is priced at ₹163 to ₹172 per share and is entirely an offer for sale of 10,71,00,000 shares (aggregating up to 1,842 crore 12 lakh rupees).

IPO Timetable (Tentative)

Central Mine Planning IPO opened for subscription on 20 March 2026 and closed on 24 March 2026. The allotment for the Central Mine Planning IPO was finalized on 25 March 2026. Central Mine Planning IPO was listed on BSE, NSE on 30 March 2026.
IPO Open Datei
The start date for applying to the IPO. It is the first day on which investors can submit their IPO applications.
20 March 2026
IPO Close Datei
The last date to submit an IPO application. It is the last day by which investors must submit their applications.
24 March 2026
Basis of Allotment Datei
The date on which the final share allotment is determined and published.
25 March 2026
Initiation of Refundsi
The date from which unallotted application amounts are returned to investors.
27 March 2026
Credit of Share to Demati
The date by which allotted shares are transferred into investors demat accounts.
27 March 2026
Listing Datei
The date when shares start trading on the stock exchanges.
30 March 2026
IPO Cut-off time (UPI mandate confirm)i
The deadline for confirming UPI payment mandates for IPO applications.
5:00 PM on 24 March 2026

Central Mine Planning & Design Institute IPO Lot Size & Required Amount

Central Mine Planning & Design Institute IPO has set a price band of per share and lot size is of shares. Retail investors can bid for a minimum of 1 lot (80 shares), requiring minimum investment of ₹13,760, and maximum upto 14 lots (1120 shares), requiring maximum investment of ₹1,92,640. Small HNI investors can bid for a minimum of 15 lots (1200 shares), requiring an investment of ₹2,06,400, small hni (sHNI) investors can bid for a maximum of 72 lots (5760 shares), requiring an investment of ₹9,90,720 and big hni (bHNI) investors can bid for a minimum of 73 Lots (5840 shares), requiring an investment of ₹10,04,480. Calculated at the cut-off price ₹ per share (the upper end of the price band).

Number of Shares Per Lot = Shares

Application Lot(s) Shares Amount
Retail (Min)i
Minimum investment required for Retail Individual Investors (RII).
1 80 ₹13,760
Retail (Max)i
Maximum investment allowed for Retail Individual Investors (Must be under ₹2 Lakhs).
14 1120 ₹1,92,640
S-HNI (Min)i
Minimum investment for Small High Net-worth Individuals (sHNI) (Must be above ₹2 Lakhs).
15 1200 ₹2,06,400
S-HNI (Max)i
Maximum investment for Small High Net-worth Individuals (sHNI) (Must be up to ₹10 Lakhs).
72 5760 ₹9,90,720
B-HNI (Min)i
Minimum investment for Big High Net-worth Individuals (bHNI) (Must be above ₹10 Lakhs).
73 5840 ₹10,04,480

IPO Reservation

Central Mine Planning IPO offers total 10,71,00,000 shares (100.00%) . Out of which 4,55,17,500 shares (42.50%) allocated to QIB, 1,82,07,000 shares (17.00%) allocated to QIB (Ex- Anchor), 1,36,55,250 shares (12.75%) allocated to NII, 3,18,62,250 shares (29.75%) allocated to RII and 2,73,10,500 shares (25.50%) allocated to Anchor investors.

Investor CategoryShares Offered
+
QIB Shares Offeredi
Qualified Institutional Buyers (e.g., mutual funds, banks).
4,55,17,500 shares (42.50%)
-
QIB (Anchor Investor)i
A portion of QIB shares reserved specifically for anchor investors.
2,73,10,500 shares (25.50%)
-
QIB (Ex. Anchor)i
Remaining QIB shares after anchor investor allocation.
1,82,07,000 shares (17.00%)
+
NII (HNI) Shares Offeredi
Non-Institutional Investors, also known as High Net-worth Individuals.
1,36,55,250 shares (12.75%)
-
bNII (bids > ₹10L)i
Big HNI category for applications above ₹10 Lakhs.
91,03,500 shares (8.50%)
-
sNII (bids < ₹10L)i
Small HNI category for applications between ₹2 Lakh and ₹10 Lakh.
45,51,750 shares (4.25%)
Employee Shares Offeredi
Shares reserved specifically for eligible employees of the company.
53,55,000 shares (5.00%)
Shareholders Shares Offered 1,07,10,000 shares (10.00%)
Retail Shares Offeredi
Retail Individual Investors applying for up to ₹2 Lakh.
3,18,62,250 shares (29.75%)
Total Shares Offered 10,71,00,000 shares (100.00%)

IPO Anchor Investors

Central Mine Planning IPO raises ₹469.74 crore from anchor investors. Central Mine Planning IPO anchor bid date was 18 March 2026.

💼 Anchor Investors Allocation Letter (PDF)
Bid Datei
The date on which anchor investors can bid for the shares.
18 March 2026
Shares Offeredi
Total number of shares allocated specifically to anchor investors.
2,73,10,500 shares
Anchor Portion (₹ Cr.)i
Total value of the shares allocated to anchor investors in crores.
469.74
Anchor lock-in period end date for 50% shares (30 Days)i
Date when 50% of the anchor investor shares become eligible for open market trading.
24 April 2026
Central Mine Planning Financials (Restated Consolidated)
Annual Performance (31 Mar 25 vs 31 Mar 24)
Central Mine Planning Financials (Restated Consolidated)'s Assets increased by 23.6%, Revenue increased by 23%, Profit After Tax increased by 32.5%, EBITDA increased by 19.8%, Net Worth increased by 28.3%, Reserves & Surplus increased by 31.1% compared to the previous financial year.
Assets
▲ 23.6% (511.43)
Revenue
▲ 23% (407.35)
Profit After Tax
▲ 32.5% (163.68)
EBITDA
▲ 19.8% (151.27)
Net Worth
▲ 28.3% (450.24)
Reserves & Surplus
▲ 31.1% (450.24)

Previous Financial Year Growth (31 Mar 24 vs 31 Mar 23)
Comparing 31 Mar 24 with 31 Mar 23, Assets increased by 13.1%, Revenue increased by 26.6%, Profit After Tax increased by 69.6%, EBITDA increased by 93.2%, Net Worth increased by 30.7%, Reserves & Surplus increased by 34.8%.
Assets (Prev Yr)
▲ 13.1% (251.84)
Revenue (Prev Yr)
▲ 26.6% (371.4)
Profit After Tax (Prev Yr)
▲ 69.6% (206.57)
EBITDA (Prev Yr)
▲ 93.2% (368.79)
Net Worth (Prev Yr)
▲ 30.7% (373.96)
Reserves & Surplus (Prev Yr)
▲ 34.8% (373.96)

2-Year Performance Change (31 Mar 23 To 31 Mar 25)
Between 31 Mar 25 and 31 Mar 23, Assets increased by 39.8%, Revenue increased by 55.7%, Profit After Tax increased by 124.8%, EBITDA increased by 131.4%, Net Worth increased by 67.7%, Reserves & Surplus increased by 76.7%.
Assets (2-Yr Change)
▲ 39.8% (763.27)
Revenue (2-Yr Change)
▲ 55.7% (778.75)
Profit After Tax (2-Yr Change)
▲ 124.8% (370.25)
EBITDA (2-Yr Change)
▲ 131.4% (520.06)
Net Worth (2-Yr Change)
▲ 67.7% (824.2)
Reserves & Surplus (2-Yr Change)
▲ 76.7% (824.2)
  31 Dec 25 In Cr. 31 Mar 25 In Cr. 31 Mar 24 In Cr. 31 Mar 23 In Cr.
Assets 2,911.12 2,682.8 2,171.37 1,919.53
Revenue 1,543.93 2,177.53 1,770.18 1,398.78
Profit After Tax 425.36 666.91 503.23 296.66
EBITDA 593.85 915.71 764.44 395.65
Net Worth 2,153.78 2,041.85 1,591.61 1,217.65
Reserves & Surplus 2,010.98 1,899.05 1,448.81 1,074.85

Financial Performance Indicator (FPI)

FPI 31 Dec 2025 31 Mar 2025
ROCEi
Return on Capital Employed indicates how efficiently a company uses its capital.
27.1%48.6%
RoNWi
RoNW (Return on Net Worth) is the percentage of profit earned relative to the company's net worth and reflects overall profitability for shareholders.
20.3%36.7%
PAT Margini
Profit After Tax as a percentage of revenue. Shows how much net profit is retained from every rupee of sales.
27.60%30.60%
EBITDA Margini
EBITDA Margin indicates earnings before interest, tax, depreciation, and amortisation as a percentage of revenue; reflects core operating efficiency.
38.50%42.10%
Price to Book Valuei
Compares the stock's market price to its book value per share. A higher ratio may indicate market premium.
6.01
Pre IPOPost IPO
EPS Rsi
Earnings Per Share is a company's profit divided by outstanding shares.
9.347.94
P/E (x)i
Price to Earnings ratio is the ratio of a stock's market price to its earnings per share. Indicates how much investors pay per rupee of earnings.
18.4121.65
Promoter Holdingi
The percentage of total shares held by the company's founders or promoter group.
100%
Market Capi
Total market value of a company's outstanding shares.
₹12,280.80 crore

IPO Peer Comparison

Company NameP/E ratioEPS (Basic)EPS (Diluted)NAV (per share)RoNW (%)P/BV
Rites25.20(Rites)8.00(Rites)8.00(Rites)57.20(Rites)15.50(Rites)3.91(Rites)
Engineers India19.90(Engineers)10.30(Engineers)10.30(Engineers)47.50(Engineers)23.50(Engineers)3.40(Engineers)
Central Mine Planning & Design Institute(Central)9.30(Central)9.30(Central)28.60(Central)36.70(Central)(Central)

IPO Subscription Status

Loading Latest IPO Data...

Central Mine Planning IPO Registrar

KFin Technologies
04067162222, 04079611000
centralmine.ipo@kfintech.com

Central Mine Planning & Design Institute IPO Lead Manager(s)

Central Mine Planning Address & Contact Details

Central Mine Planning Address
Gondwana Place, Kanke Road Ranchi, Jharkhand, 834008
0651 2230169
complianceoff.cmpdi@coalindia.in